We took Dream Weaver to the boat yard at the end of April to have the rigger entirely replace the standing rigging (the wires that hold the mast in place) and the running rigging (the “rope”/line by which the sails are controlled). While still in relatively good condition, these would eventually need to be replaced … Continue reading Rigging